
Lee County District CTE Building
Fowler Engineering provided structural engineering services for this facility that included 5 classrooms and 4 shop areas with classrooms, along with restrooms, a conference room, and two collaboration spaces for events. Construction materials for this 33,000 ft² facility include structural and light gauge steel along with pre-engineered metal building.
Location: Tupelo, MS
Architect: PryorMorrow
Sq. Footage: 33,000 ft²




